5 April 2010
- Issue of Safety gazettes
- Plant Safety Induction
- General Overview for Power Plant

Trainer: Mr. Foo Chia Ming , Mr.Lee Chong Sheng, Mr. Lee Yong Sooi, Mr. Wong Kok Loon

6-9 April 2010
- Familiarization of mechanical maintenance process
- Pump maintenance, service, pump curves and NPSH
- Exposure on gas turbine preventive maintenance works

Trainer: Mr. Prakash

12-19 April 2010
- HRSG 18 and Package Boiler prestart checks, start-up, shut down.
- Boiler process control and monitoring philosophy(Delta V)
- Steam supply normalization and isolation
- Boiler preservation
- Steam water analysis system
- Chemical dosing system
-Blow down system

Trainer: Mr. Low Lik Phui